Bridges

Temporary Bridges | Farm Bridges | Bridge Refurbishment | Underpasses | Culverts | Swing Bridges | Foundations

Available Now: 12m Emergency or Temporary Bridges. Installed within 24 hours

Farm Bridges

Click to enlarge

Click to enlarge

Click to enlarge

Customised to your needs

Bridge It NZ pre-fabricates bridge modules so we have stock on hand for your project. We customise bridge width and length to suit your needs.
Steel beam construction - timber or concrete load rated decks.
Available as self-installation or on a delivery and installation basis.
Durable and engineered for rural installation
Easily transportable and fully compliant to council regulations

Estimated Delivery Time:
3 weeks from order
Estimated Install Time:
3 weeks from project approval
Assembly:
Modular Bridges can be assembled using a crane, loader or excavator.

Bridge It NZ provides a free consultation and install to your particular requirements. The design will incorporate the Full Highway Design Brief 1965 and amendments for full Class One loadings as per NZ TRANSIT Bridge Manual.

Koopals Farm Bridge in Rotorua
See photos...

Bridge Refurbishment

Click to enlarge

Click to enlarge

In some cases it may not be necessary to replace an existing structure which may be suitable for an overhaul and refurbishment. As experienced consultants and engineers Bridge It NZ Ltd is able to assess existing structures and discuss options for refurbishment.

    • Strip and replace existing bridge planks
  • Repair or reinforce existing foundations
  • Sandblast and/or repair existing steelworks

In some cases existing structures will not be salvageable and will need to be removed prior to installation of any new structures.

Case Study: 18m Bridge Refit in PioPio
Existing steel beams and abutments were sandblasted and re-painted.
Old bridge deck replaced with new concrete deck.

See more photos...

Temporary Bridges

Click to enlarge
We supply and install Emergency and Temporary Bridges in the North Island.

These 12m temporary or emergency bridges can be delivered within 24 hours and are rated to carry a maximum 10 tonne load with a maximum 6 tonne axle load. Our team will give you an on site free consultation and discuss the best solution for your needs.

Our modular bridging is available within 24 hours

Waiouru Temporary Bridging See more photos...

Underpasses

Click to enlarge

We supply and install underpasses in the North Island.

Our team will advise, quote and install to your requirements. We can also supply modular underpasses for your project available for self installation or fully installed.

  • Fully customisable underpass modules designed for use under roads or tracks
  • Available as self installation or on a delivery and installation basis
  • Rapid solution and fully customisable to fit individual requirements
  • Durable and engineered for rural installation and heavy traffic
  • Fully compliant to council regulations

Swing Bridges

Click to enlarge

We can supply and install Swing Bridges in the North Island.

Pedestrian Swing Bridges or Cycle Bridges. Our team will advise, quote and install to your requirements. You can email us for a free consultation.

  • Fully customisable to fit individual requirements
  • Fully compliant to council regulations

Bridge Foundations

The life span of a bridge is normally limited to the quality of the foundations by which the bridge is supported. Bridge It NZ are able to offer a free consultation to assess your needs and advise on the most suitable foundation options. The soil type, water flow, usage and road approach will all affect the recommended specification.

back to top