Photo Gallery
Taumaranui | Foxley Bridge
22m x 3.6m Bridge: Full Class 1 Farm Bridge with concrete deck and wooden handrails. Click photo to enlarge:


Watch the building of this bridge
Hunua | Transpower New Bridge
9m Bridge Construction: Steel beams, concrete deck and galvanised pipe handrails. 12 tonne axle loading to Highway overload standard HN-HO-72. Bridge designed to take a 200 tonne (lift capacity) crane. Click photo to enlarge:Piopio | Holmes Bridge Refurbishment
18m Bridge Refit: Existing steel beams and abutments sandblasted and painted. Old bridge deck replaced with new concrete deck. Bridge strengthened to increase load capacity to a Full Class 1 rating (7.5 ton per axle). Click photo to enlarge:Rotorua | Koopals New Bridge
9m x 4m Bridge: Full Class 1 Farm Bridge with concrete deck and wooden handrails. Bridge abutments were created using INTERBLOC concrete block system. Click photo to enlarge:
Te Aroha | Farm Bridge
12m x 4m Bridge: As seen at the Field Days. Modular Farm Bridge with wooden deck. Click photo to enlarge:
Waiouru | Temporary Bridges
12 x 3m Bridge: These temporary or emergency bridges can be delivered within 24 hours and are rated to carry a maximum 10 tonne load with a maximum 6 tonne axle load. Built to carry a large silage wagon and tractor or for fertiliser trucks. Click photo to enlarge:




















