News & Media


The Bridge It Team - all on the same page

19 September 2019

Recently the Bridge It NZ team downed tools and spent the day together developing our team values. It was so great to see how aligned we are as a...

The Bridge It Team - all on the same page

Loaded & Ready to Go

13 August 2019

Always great to see another concrete bridge loaded and ready to go to site. Standing by are new Site Supervisor, Liam Bellman (left) and Managing...

Loaded & Ready to Go

CCNZ Construction Excellence awards 2019

6 August 2019

We are extremely proud to be finalist in the 1A Category at the CCNZ Construction Excellence Awards 2019 on Friday night, for the design and...

CCNZ Construction Excellence awards 2019

Mobilising to Waikato

2 July 2019

The Bridge IT NZ team mobilising to a Waikato farm site with a 21m x 4m Steel Beam / Concrete Deck bridge – ideal for longer spans and heavy...

Mobilising to Waikato

Visiting bridge sites on the East Coast

27 June 2019

Recently our new sales person John Musgrave has been visiting bridge sites in the East Coast region - here's one of the sites he visited where we...

Visiting bridge sites on the East Coast

And the Winner is.....

20 June 2019

Blair Judd of Midhirst, Taranaki CONGRATULATIONS! Blair guessed the weight of 12.5T, which was the closest guess to the actual bridge weight...

And the Winner is.....

Te Araroa bridge replaced

8 September 2017

A 60-year-old bridge near Te Araroa has been replaced with a modern concrete and steel replacement, boosting its load capacity from one tonne to 44...

Te Araroa bridge replaced

New bridges and cycle trails great asset for the city

26 March 2017

Two new $285,000 cyclist and pedestrian bridges built over a stream at either end of the Takitumu Toll Road are part of the plan to create a commuter...

New bridges and cycle trails great asset for the city

Bridge It NZ recognised for Excellence in Construction for the Third Consecutive Year

6 August 2016

Bridge It NZ has a proud record of building award winning structures for our clients and their communities.  This year was no different, as...

Bridge It NZ recognised for Excellence in Construction for the Third Consecutive Year

We're stoked to have won for the second year running!

19 August 2015

Bridge It NZ took top honours in the 2015 Hirepool Construction Excellence Awards for the second year running, winning Category One of the awards for...

We're stoked to have won for the second year running!

Top Honours at Awards Night

12 August 2014

Bridge It NZ won the 2014 Hirepool "Excellence in Construction Award" for a unique farm bridge project. Bridge It NZ Ltd, formed six...

Top Honours at Awards Night

New McLaren Falls Pedestrian Bridge

1 August 2014

Bridge It NZ Ltd was the successful contractor for building the new Pedestrian suspension footbridge alongside the current single lane bridge across...

New McLaren Falls Pedestrian Bridge