Our Projects


Remedial Work on Farm Bridge

Our team recently did some remedial work on a farm bridge in Paengaroa. This involved lifting out the bridge superstructure, putting in new piles and abutments and lifting the superstructure back into place. While there we...

Remedial Work on Farm Bridge

Aratu Forests Limited bridge project highlights the value of understanding client needs in-depth

Time sensitive harvest operations and restricted road access were key factors in the decision of Aratu Forests to engage Bridge It NZ to deliver a customised bridging solution for their Gisborne site. The proposed site for...

Aratu Forests Limited bridge project highlights the value of understanding client needs in-depth

12M ALL CONCRETE TT BRIDGE PROVIDES ACCESS FOR NORTHLAND FARM

The Bridge It NZ team hard out constructing new bridge abutments onsite, prior to the bridge being lifted into place. Once the bridge is in place, handrails are installed and our hard working crew, which includes our new...

12M ALL CONCRETE TT BRIDGE PROVIDES ACCESS FOR NORTHLAND FARM

Sandford Park pedestrian bridge replacement significantly reduces cost to Hamilton City Council

A collaboration between Bridge It and Hamilton City Council has delivered great results for residents who enjoy two of the city’s parks. As part of its Long Term Plan, the Council allocated funding to two bridge...

Sandford Park pedestrian bridge replacement significantly reduces cost to Hamilton City Council

Another Bridge It NZ bridge provides better access for Coromandel Farmer

The old bridge on this Coromandel farm was unable to support heavy loads so only limited access to the other side was possible. A solution that allowed full access for machinery was required to maximise use of the land. The...

Another Bridge It NZ bridge provides better access for Coromandel Farmer

New bridge replaces old culvert

Our client required access for a maturing forestry block near Gisborne. With the existing culvert unable to support the heavy forestry equipment, a new HNHO-72 bridge is being installed. With a tight timeline to ensure...

New bridge replaces old culvert

New CFT cycleway bridge for Waihi

Our intrepid Engineer, Craig Langsford doing a site survey for a new Composite Fibre (CFT) cycleway bridge for the Western BOP District Council at Waihi Beach. CFT is the ideal solution for this project, being high strength,...

New CFT cycleway bridge for Waihi

Billy Point Wharf Walkway Demolition

The Bridge It NZ team are currently demolishing 56 meters of existing elevated walkway at Billy Point Wharf, Pauanui. In an interesting twist, Craig White’s (BINZ Site Supervisor) father Daryl, was part of the team...

Billy Point Wharf Walkway Demolition

Finding the Right Solution for a Railway Crossing Bridge

Hikurangi Forest Farms, now Aratu Forests Ltd, needed an answer to a tricky bridge project and Bridge It NZ, working in close collaboration with them, provided the ideal solution. The project was a railway crossing...

Finding the Right Solution for a Railway Crossing Bridge

New 22m Bridge for Otorohanga Farm

A new 22m Steel Beam, Concrete Deck farm bridge has been installed just out of Otorohanga (Hangatiki). Replacing an old steel beam, timber deck structure, the new bridge is now in line with council requirements. The winter...

New 22m Bridge for Otorohanga Farm

New Papamoa Cycleway Bridge

Finishing off a cycleway bridge in Papamoa. We do it all from heavy loading Forestry bridges, through to light weight structures like this which connects...

New Papamoa Cycleway Bridge

Rotoma - Rotoiti Sewerage Scheme Foot Bridge

Just a quick update on one of our projects, a small foot bridge with a composite fibre deck, currently being installed on SH30, opposite Lake Rotoiti for Fulton Hogan as part of the Rotoiti Sewerage Scheme. Its always great...

Rotoma - Rotoiti Sewerage Scheme Foot Bridge

Out with old and in with the new for South Taranaki farm

This Hawera farm needed a replacement for their existing steel beam (railway irons), and timber deck bridge that provides farm access over the Mangatoki Stream. Bridge It NZ provided a complete solution for them by firstly...

Out with old and in with the new for South Taranaki farm

Purpose Built Bridge Connecting Two Farm Blocks Set To Ease Access Issues

  For Bridge It NZ, a key part of working with our clients is to ensure that our recommended bridge solution meets their needs. Design, construction and budget are all factors that need to be considered....

Purpose Built Bridge Connecting Two Farm Blocks Set To Ease Access Issues

66m & 45m Bridges for Royal Auckland & Grange Golf Club

The brief to Bridge It NZ was to design and construct a bridge connecting two amalgamated golf courses - the Royal Auckland and Grange Golf Clubs. A 66.5m x 3.6m multi-span bridge was needed to take pedestrians and their...

66m & 45m Bridges for Royal Auckland & Grange Golf Club

Steel Beam Concrete Deck Bridge for a Waikato based Farm

Our steel beam concrete deck bridge is a popular bridge among farmers as it is ideal for sites that cannot be reached easily like rural properties, subdivisions and the forestry sector. The steel beams also able us to...

Steel Beam Concrete Deck Bridge for a Waikato based Farm

All Concrete Bridge Providing an Excellent on Farm Solution

The concrete double T is a versatile and durable bridge. This 14m x 4m all concrete bridge was designed and installed for Steffert Farms near Waharoa, Waikato. Our team were on site and had the bridge installed within 5...

All Concrete Bridge Providing an Excellent on Farm Solution

All Concrete Farm Bridge in Taranaki

"Bridge It NZ, Pat Seuren, Campbell Upperton and Donald Richardson from Tiaki Engineering Consultants, we thank you all for the professional way you handled our job and keeping us informed. Preparing the abutments was...

All Concrete Farm Bridge in Taranaki

All Weather Access to Katikati Home

Heavy rains often meant the Crispin’s could not access their home. The culvert located on their driveway was prone to flooding, required regular maintenance to the approaches and clearing of debris. Our steel beam...

All Weather Access to Katikati Home

A Bridge Solution to Cross Railway in the Western Bay of Plenty

Western Bay of Plenty District Council required a replacement bridge to provide residential access over the railway line at Jess Road Whakamara. 21m long and 4.6m wide concrete hollow core bridge, designed to NZTA Bridge...

A Bridge Solution to Cross Railway in the Western Bay of Plenty

Boston Forest Bridge crossing Mangatu Stream

South of Benneydale in the Boston Forest, Bridge It NZ were tasked with the replacement of an existing timber bridge not capable of taking heavy loads.  Spanning the Mangatu Stream, the brief was to design and construct...

Boston Forest Bridge crossing Mangatu Stream

Two New Bridges on Great Barrier Island

Bridge It NZ recently completed the construcion of two bridges for a site near Rosalie Bay Road,  Great Barrier Island. The client  commented: "I have been totally impressed with the job you have done here. A...

Two New Bridges on Great Barrier Island

Concrete Pedestrian Suspension Bridge at McLaren Falls

Bridge It NZ worked with designers Tiaki Engineering to develop an innovative solution to provide a visually appealing footbridge, spanning 33m, at an affordable price at McLarens Falls. We had to use one of the biggest...

Concrete Pedestrian Suspension Bridge at McLaren Falls

Clear-Span Bridge over the River Motu

Built for farmers Mark and Jane Johnson, the 34m long steel and concrete farm bridge is the biggest clear-span bridge to date for Bridge It. The new bridge replaced an ageing swing bridge originally built by Mark's...

Clear-Span Bridge over the River Motu