We offer total project management and 'no surprises pricing'

Bridge It NZ delivers hassle-free bridge projects on time and on budget. We specialise in safe, compliant, high-quality solutions that meet your site’s unique needs and challenges.

New Farm Bridge Restores Access Near Te Hana

Other

When the Warkworth–Te Hana SH1 motorway upgrade affected our client’s existing access, we delivered a 26m Steel Beam Concrete Deck bridge and a 14m All Concrete bridge to keep the property connected.

Overcoming Immense Hurdles At Tukemokihi Station

Case Study

In October 2024 we completed the longest and most complex single-span bridge we have ever built, in the most difficult terrain we have ever faced. We set about designing an innovative, lightweight solution that would overcome all obstacles and allow both stock and farm machinery to get across the 50m ravine (rated to 0.35HN).

Concrete Pedestrian Suspension Bridge at McLaren Falls

Awards

Traditional methods of proportionality in architecture are based on the principle of similarity of parts. It is believed that the use of a connected system of proportions ensures the unity of the composition. Depending on the idea, the architect uses relations expressed in whole numbers or irrational relations based on a system of simple graphic constructions.

Concrete Pedestrian Suspension Bridge at McLaren Falls

Awards

Traditional methods of proportionality in architecture are based on the principle of similarity of parts. It is believed that the use of a connected system of proportions ensures the unity of the composition. Depending on the idea, the architect uses relations expressed in whole numbers or irrational relations based on a system of simple graphic constructions.

Overcoming Immense Hurdles At Tukemokihi Station

Case Study

In October 2024 we completed the longest and most complex single-span bridge we have ever built, in the most difficult terrain we have ever faced. We set about designing an innovative, lightweight solution that would overcome all obstacles and allow both stock and farm machinery to get across the 50m ravine (rated to 0.35HN).

New Farm Bridge Restores Access Near Te Hana

Other

When the Warkworth–Te Hana SH1 motorway upgrade affected our client’s existing access, we delivered a 26m Steel Beam Concrete Deck bridge and a 14m All Concrete bridge to keep the property connected.

Contact us

Keen to get in touch?
We'd love to hear from you.

Tauranga Office

15 Maru Street, Mount Maunganui, Tauranga 3116

Christchurch Office

6 Abros Place, Burnside, Christchurch 8053

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Subscribe to our Newsletter!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.