
Overcoming Immense Hurdles At Tukemokihi Station
Case StudyIn October 2024 we completed the longest and most complex single-span bridge we have ever built, in the most difficult terrain we have ever faced. We set about designing an innovative, lightweight solution that would overcome all obstacles and allow both stock and farm machinery to get across the 50m ravine (rated to 0.35HN).