Mobilising to Waikato

2 July 2019
Mobilising to Waikato

The Bridge IT NZ team mobilising to a Waikato farm site with a 21m x 4m Steel Beam / Concrete Deck bridge – ideal for longer spans and heavy loads (0.85HN). Tractors / harvesters / truck & trailers.